You are loading a cargo of bagged coffee beans.To keep cargo leakage from being contaminated by the ship's structure,you should ______.
A.use separation cloths between the deck and cargo
B.place the cargo on a layer of spaced dunnage
C.hose down the deck before loading the cargo
D.use bag-on-bag stowage
第1题:
Your tow includes a loaded chlorine barge.After inspecting the tow,the mate reports that he hears a hissing sound coming from the safety valves.Where will you find information on emergency procedures concerning the uncontrolled release of cargo ________.
A.Barge's Certificate of Inspection
B.Cargo Information Card on your towboat
C.Cargo Manifest or loading paper
D.Dangerous Cargo Regulations
第2题:
Bonding cables are used during cargo transfer to ______.
A.provide safe electrical power connection to barge equipment
B.keep the vessel from surging excessively
C.prevent an accidental discharge of static electricity
D.secure the cargo hose to a hatch when loading overall
第3题:
In the stowage of deck cargo,cribbing is ______.
A.Placed on deck to support the cargo
B.Separation pieces used to keep cylinders upright and steady
C.Shims for stowing baled cargo
D.Nets placed across the hatch opening to keep the cargo from falling in the hatch
第4题:
Get ready the mooring machinery, mooring lines and the gangway for ().
第5题:
大副告诉装卸工人不要用钩子装袋装货。()
第6题:
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.
A.Alternate hold loading condition
B.Block hold loading condition
C.Part hold loading condition
D.Homogeneous hold loading condition
第7题:
The()(地脚货) must be bagged.
第8题:
The wooden planking that protects the tank top from cargo loading is called ______.
A.Ceiling
B.Shores
C.Frames
D.Toms
第9题:
It is flammable cargo. Keep it away from the ().
第10题:
You ()use hooks when discharging bagged cargo.