IBM认证考试

The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()A、Use ssh to connect to the HMC and rebootB、The upgrade will display complete and ask you to reboo

题目

The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()

  • A、Use ssh to connect to the HMC and reboot
  • B、The upgrade will display complete and ask you to reboot
  • C、Select shutdown in the Management section of the WebSM client
  • D、Once logged out of the WebSM client it will ask to logoff, shutdown or reboot. Select reboot.
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

WhichoneofthesestatementsistrueregardinghotpluggablePCIeandPCI-XslotsinaPower550?()

A.CardscanbeaddedandthenenabledviaHardwareManagementConsole(HMC)GUIorcommandline.

B.TheHMCallowsaccesstotheAdvancedSystemManagementInterface(ASMI),wheretheslotscanbemanaged.

C.IftheemptyslotwasalreadyallocatedtoanLPAR,theLPARcanusethecardafterthecfgmgrscripthasbeenrun.

D.TheHardwareManagementConsole(HMC)GUIcanguideacustomerthroughtheprocessofaddingacardtoanemptyslot.


参考答案:B

第2题:

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMc  
  • B、Asynchronous adapters on the new HMc
  • C、The two 570 servers are directly connected to the new HMc  
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

正确答案:A

第3题:

WhichofthefollowingcandeploysystemplansgeneratedbytheIBMSystemPlanningTool(SPT)?()

A.TheHardwareManagementConsole(HMC)andIntegratedVirtualizationManager(IVM).

B.TheHardwareManagementConsole(HMC)andAdvancedSystemManagerInterface(ASMI).

C.IntegratedVirtualizationManager(IVM)andAdvancedSystemManagerInterface(ASMI).

D.IntegratedVirtualizationManager(IVM)andBladeCenterAdvancedManagementModule(AMM).


参考答案:A

第4题:

The customer intends to install a 7315-CR2 into a p690 frame.  What should the pSeries technical specialist tell the customer?()

  • A、The HMC is a 19" form factor.
  • B、The HMC is a 24" form factor.
  • C、The HMC requires a 100-120 volt power connection.
  • D、The HMC requires a 200-240 volt power connection.

正确答案:A

第5题:

A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()

  • A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
  • B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
  • C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
  • D、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

正确答案:C

第6题:

下面那些代码是普力马的车型代码()

  • A、HMC7160B3S0
  • B、HMC6433E
  • C、HMC7162A
  • D、HMC6434A3M0
  • E、HMC7180
  • F、HMC7186B3/4

正确答案:B,D,F

第7题:

A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC.  Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()

  • A、Are there at least ten RS-232 ports available on the HMC?
  • B、Are there at least ten RS-422 ports available on the HMC?
  • C、Are there at least ten RS-232 and two RS-422 ports available on the HMC?
  • D、Are there at least two RS-232 and ten RS-422 ports available on the HMC?

正确答案:C

第8题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案:A

第9题:

下面那些代码是丘比特的车型代码()

  • A、HMC7151A4H0
  • B、HMC7161
  • C、HMC7163
  • D、HMC7132A4H0
  • E、HMC7133A4H0
  • F、HMC7160B3S0

正确答案:A,D,E

第10题:

Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()

  • A、The resources must be unallocated in an LPAR
  • B、The microcode on the pSeries must be current
  • C、All network adapters on the LPAR must be defined
  • D、Network connectivity and name resolution capability between HMC and LPARs

正确答案:D

更多相关问题