单选题A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()A An HMC is required for dual VIO servers.B Dual VIO servers require a split backplane.C A dual VIO

题目
单选题
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
A

An HMC is required for dual VIO servers.

B

Dual VIO servers require a split backplane.

C

A dual VIO enablement code must be entered from the ASMI interface.

D

The second VIO server must be created using the IVM command line interface.

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer with a well-known brand wants to make sure they have a Green decision in their next IT infrastructure investment.   How can IBM Cool Blue help this customer? ()

  • A、Providing tools to plan, monitor, manage, and reduce power consumption.
  • B、Reducing cooling requirements by running CPUs at lower speeds.
  • C、Using smart system design to create high-power servers.
  • D、Adapting existing solutions like the Rear Door eXpander.

正确答案:A

第2题:

What restrictions apply to using virtual Ethernet within a cluster containing VIO clients?()

  • A、IPAT via Aliasing must be used
  • B、IPAT via Replacement must be used
  • C、Resilience must be provided by the use of dual VIO servers
  • D、Hardware Address Takeover (HWAT) must be used to ensure a consistent virtual MAC address

正确答案:A

第3题:

A customer has many RS/6000s and POWER4 systems running different AIX applications.  What should the customer do to best position themselves for the migration to POWER5?()

  • A、Upgrade OS to AIX 5.2.
  • B、Implement Micro-Partitioning.
  • C、Upgrade HMC to support POWER5.
  • D、Install Partition Load Manager.

正确答案:A

第4题:

A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers.   Which technology is recommended for this proposal?()

  • A、NPIV
  • B、vSCSI
  • C、Arbitrated loop
  • D、Converged adapter

正确答案:A

第5题:

A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

  • A、Two dual-port PCIe adapters
  • B、A four-port PCIe Ethernet adapter
  • C、Four separate PCIe Ethernet adapters
  • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

正确答案:C

第6题:

A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()

  • A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
  • B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
  • C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
  • D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

正确答案:D

第7题:

A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()

  • A、Create a VIO server
  • B、Modify the LPAR profiles to add a Virtual Ethernet adapter
  • C、Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
  • D、Buy the Advanced Power Virtualization feature and enter a authorization code at the service  processor menu

正确答案:B

第8题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第9题:

Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()

  • A、Physically press the appropriate button on the system.
  • B、Physically disconnect and reconnect the power cable on the system.
  • C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
  • D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

正确答案:A

第10题:

A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()

  • A、IBM i Edition
  • B、Express Edition
  • C、Standard Edition
  • D、Enterprise Edition

正确答案:C