occurs
incurs
discus
recurs
第1题:
A、that should reach
B、which should reach
C、when it reaches
D、which should arrive at
第2题:
The Shipowner is under a duty to ________ the vessel to the port of loading even though it is impossible for her to get there by the canceling date.
A.mend
B.bend
C.rend
D.send
第3题:
Thousands of lives will be ________ if help does not arrive in the city soon.
A at stake
B at ease
C at random
D at hand
第4题:
Why is QoS important in a converged network?()
第5题:
If the Sellers anticipate that,notwithstanding the exercise of due diligence by them,the Vessel will not be ready for delivery by the canceling date they may notify the Buyers in writing ______ stating the date when they anticipate that the Vessel will be ready for delivery.
A.the date of declaration
B.date of Notice of Readiness
C.the canceling date
D.the date of delivery
第6题:
Risk of collision may exist ______.
A.if the compass bearing of an approaching vessel does NOT appreciably change
B.even when an appreciable bearing change is evident, particularly when approaching a vessel at close range
C.if you observe both sidelights of a vessel ahead for an extended period of time
D.All of the above
第7题:
Where a charter-party specifies the estimated time of arrival of a vessel at the port of loading, there is ________ on the shipowners to sail to there on the date on which when proceeding with all convenient speed it would normally reach the port on or about the estimated date of arrival.
A.a necessary right
B.an absolute observation
C.an absolute obligation
D.a possible solution
第8题:
The carrying vessel chartered by the Seller shall sail and arrive at the port of departure within the normal and reasonable period of time.()
第9题:
第10题:
number of licensed personnel required on board
maximum load line draft
maximum water depth for drilling
next date for an inclining experiment