问题:单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard EditionB VMControl Standard EditionC Hardware Management ConsoleD IBM Systems Director Standard Edition
Thursday, November 9, 2023
问题:单选题An customer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()A DS6800B DS8100C DS8300D XIV Storage System
Tuesday, September 12, 2023
问题:单选题A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A PCIe adaptersB PCI-X adaptersC PCI-X and PCIe adaptersD PCI, PCI-X and PCIe adapters
Tuesday, November 21, 2023
问题:单选题Which of the following uses compression/decompression to increase the memory available for client workloads?()A PowerVMB VMControlC Active Memory SharingD Active Memory Expansion
Friday, October 20, 2023
问题:单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()A Upgrade to VMControl Standard EditionB Upgrade to VMControl Enterprise EditionC Upgrade to latest version of VMControl Express EditionD Download the latest fixes for VMControl Express Edition
Monday, March 20, 2023
问题:单选题A BladeCenter S chassis with 2 storage modules requires how many power supplies?()A 1B 2C 4D 6
Friday, September 15, 2023
问题:单选题A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()A Enable automatic problem reporting from smitB Use IVM to enable console mirroring to IBM Remote Support.C Use the HMC to enable reporting through Electronic Service Agent.D Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
Monday, December 11, 2023
问题:单选题The Power 720 is offered with how many cores?()A 1, 2, or 4B 2, 4, or 6C 2, 4, or 8D 4, 6, or 8
Wednesday, February 1, 2023
问题:单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A A second IVE adapterB A second processor cardC PowerVM Enterprise EditionD An additional cable-management arm
问题:单选题Which of the following functions can be performed using the Integrated Virtualization Manager?()A Concurrent firmware updatesB Management of virtual storageC Hot add/remove of I/O drawersD Management of Capacity on Demand
Friday, May 12, 2023
问题:单选题A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?()A Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be capped.B Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be uncapped.C Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partitions to use no more than one core. Configure the HMC scheduler to dynamically assign processors among the pools over a day.D Create a shared processor pool for each production partition, with the maximum processor limit set to the licensing limit for the application in the pool. Assign the development and testing partitions to a processor pool with a maximum of 1 core. Configure each partition to use uncapped processing.
Monday, January 30, 2023
问题:单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()A Order a 2-port 1Gbps Ethernet LAN adapter.B Order a 2-port 10Gbps Ethernet LAN adapter.C Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.D Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.
Saturday, September 17, 2022
问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()A PowerHA SystemMirror Basic EditionB PowerHA SystemMirror Express EditionC PowerHA SystemMirror Standard EditionD PowerHA SystemMirror Enterprise Edition
问题:单选题A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A 2 PCI-X drawers and 2 PCIe drawersB 3 PCI-X drawers and 4 PCIe drawersC 4 PCI-X drawers and 3 PCIe drawersD 4 PCI-X drawers and 2 PCIe drawers
Thursday, May 11, 2023
问题:单选题A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()A Implement PowerHA SystemMirror on both VIO servers.B Configure Etherchannel between the client LPARs and the two VIO serversC Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.D Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.
问题:单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A 4B 8C 16D 32
Saturday, October 21, 2023
问题:单选题Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()A Redundant system clocksB Redundant service processorsC eDRAM chips have redundant L3 cacheD Main memory DIMMs contain a redundant DRAM chip
问题:单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A A second IVE adapterB A second processor cardC PowerVM Enterprise EditionD An additional cable-management arm