is the output of the quality planning.
A.Scope baseline
B. Cost of quality
C.Scope checklist
D.Quality checklist
第1题:
A proven effective means to insure quality conformance is to:
A . delegate accountability to subordinates
B . revise quality specifications to match quality measurements
C . train workers in proper quality methods
D . inspect quality into the product
E . make quality a higher priority than cost or schedule
第2题:
Which of the following statements about the cost of quality are true?
A . the cost of quality is the expense of nonconformance to requirements and specifications.
B . the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.
C . quality control programs should be implemented when the cost of quality are deemed affordable by management.
D . A and B.
E . A and C
第3题:
Project trade-offs vary between
A . risk, cost and schedule.
B . direct cost, indirect cost, and resource availability
C . quality, schedule and time
D . cost, quality and schedule
E . contract terms, scope and budget
第4题:
130 What is the relative priority of project Cost, Schedule and Quality?
A. 1)Cost - 2)Schedule - 3)Quality
B. 1)Quality - 2)Schedule - 3)Cost
C. 1)Quality - 2)Cost - 3)Schedule
D. 1)Schedule - 2)Quality - 3)Cost
E. All are of equal priority
第5题:
100 The auditing function that provides feedback about the quality of output is referred to as:
A. quality control.
B. quality planning.
C. quality assurance.
D. quality improvement
E. All of the above
第6题:
What is the relative priority of project Cost, Schedule and Quality?
A . 1)Cost - 2)Schedule - 3)Quality
B . 1)Quality - 2)Schedule - 3)Cost
C . 1)Quality - 2)Cost - 3)Schedule
D . 1)Schedule - 2)Quality - 3)Cost
E . All are of equal priority
第7题:
The auditing function that provides feedback about the quality of output is referred to as:
A . quality control.
B . quality planning.
C . quality assurance.
D . quality improvement
E . All of the above.
第8题:
Project tradeoffs are usually made by comparing _____ and constraints.
ATime, cost, and quality
BTime, risk, and quality
CRisk, quality, and manpower availability
DCost, quality, and technical performance
ECost, quality, and risk
第9题:
16 Which of the following statements about the cost of quality are true?
A. the cost of quality is the expense of nonconformance to requirements and specifications.
B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product. C. quality control programs should be implemented when the cost of quality are deemed affordable by management.
D. A and B.
E. A and C
第10题:
132 A proven effective means to insure quality conformance is to:
A. delegate accountability to subordinates
B. revise quality specifications to match quality measurements
C. train workers in proper quality methods
D. inspect quality into the product
E. make quality a higher priority than cost or schedule