软件水平考试

Requirements management is a ( ) process throughout a project.A requirement is a capability to which a project outcome(product or service)should conform. A.persistent B.continuingC.permanent D.continuous

题目
Requirements management is a ( ) process throughout a project.A requirement is a capability to which a project outcome(product or service)should conform.

A.persistent
B.continuing
C.permanent
D.continuous
参考答案和解析
答案:D
解析:
需求管理(持续)贯穿于整个项目过程。需求管理是一种能力,与交付的项目成果(产品或服务)应一致。A.坚持的 B.继续的 C.永久的 D.连续的
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

In the project management context,() includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other stakeholder requirements, and managing expectations.

A.Integration

B.Scope

C.Configuration

D.Requirement


参考答案:B

第2题:

The(69)Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.

A.Plannlng

B.Executing

C.Monitoring and Controlling

D.Closing


正确答案:B
解析:执行过程组由用于完成为达成项目要求而在项目管理计划中定义的工作的过程组成。

第3题:

The extent of project management techniques to be used on a project are determined mainly by the _____ and _____ of the project.

A . budget, schedule

B . quality requirements, schedule

C . size, type of industry

D . nature, size

E . project manager, sponsor


正确答案:D

 

第4题:

● Which statement about the preliminary design stage of a software development project is true? (75) .

(75)

A.The preliminary design is an internal document used only by programmers

B.The preliminary design is the result of mapping product requirements info software and hardware functions

C.The preliminary design of the product comes from the requirement specification

D.The developers produce the preliminary design by defining the software structure in enough detail to permit coding


正确答案:C

第5题:

()is the process of formalizing acceptance of the completed project deliverables. The key benefit of this process is that it brings objectivity to the acceptance process and increases the probability of final product, service,or result acceptance by validating each deliverable。

A、Validate scope

B、Define scope

C、Control scope

D、Collect requirement


正确答案:C

第6题:

● The degree to which a company accepts and utilizes project management is often dependent upon the _____ and _____ of the project.

A Competition, dollar value

B Type of industry, manpower requirements

C Size, nature

D Quality requirements, manpower requirement

E Type of industry, risk


正确答案:C

第7题:

Project Quality Management must address the management of the project and the ()of the project.While Project Quality Management applies to all projects, regardless of the nature of their product,product quality measures and techniques are specific to the particular type of product produced by the project.()A.performance B.process C.product D.object


正确答案:C

项目质量管理必需专注于对项目和项目产品的管理。当所有的项目在运用项目质量管理时,无论项目产品的本质如何,都要依据项目所产生产品的类型明确产品质量的度量和技术。

第8题:

Which of the following types of specifications gives measurable capabilities of the product:

A functional specifications

B performance specifications

C conformance specifications

D technical specifications

E process capability specification


正确答案:B

第9题:

● Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.(75) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.

(75)

A.Cost-Benefit analysis

B.Control charts

C.Quality function deployment

D.Cost of quality analysis


正确答案:D
试题(75)分析
 质量分析成本Cost of quality analysis是对产品或服务进行需求一致性分析所产生的成本;
 成本效益分析Cost-Benefit analysi是通过比较项目的全部成本和效益来评估项目价值的一种方法;
 控制图Control charts是项目质量控制方法;
 质量功能展开Quality function deployment是把顾客或市场的要求转化为设计要求、零部件特性、工艺要求、生产要求的多层次演绎分析方法
 因此,因此选D
参考答案
(75)D

第10题:

Requirements management is the process of ( 73 ),analyzing, tracing,prioritizing and agreeing on requirements and then controlling changes and communicating to relevant stakeholders. It is a ( 74 ) process throughout a project. A requirement is a capability to which a project outcome (product or service) should conform.

A.communicating

B.collecting

C.filing

D.documenting


正确答案:D