问题:单选题A System x administrator is considering new storage subsystems. Which is a benefit of SAS over Solid State of the following?()A Higher transfer speedsB Increased power consumption with Solid StateC Increased bandwidthD Cost per MB
Friday, January 26, 2024
问题:单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()A Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchB Using blade servers with the NPIV switch will require morefibre ports on the external fibre switchC Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.D The NPIV switch will count against the number of domains in a fabric
Wednesday, November 8, 2023
问题:单选题A customer asks which bays they could install Multi-Switch Interconnect Module (MSIM). Which is the source of this information of the following?()A CDATB IBM Systems DirectorC Tivoli Provisioning Manager (TPM)D xREF
Saturday, April 6, 2024
问题:单选题A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A Two additional power suppliesB Fibre Channel (FC) switches and SAN storageC A Nortel 1/10 GB ESMD SSD for the HX5
Friday, November 24, 2023
问题:单选题A customer wants to update their system with the latest drivers. Which tools would you suggest of the following?()A Bootable Media CreatorB Advanced Settings UtilityC Update Express System Pack InstallerD ServerGuide Scripting Toolkit
Wednesday, February 14, 2024
问题:单选题A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()A A power module has failed and there is not enough power to see video on all blades.B MUX 3 on theBladeCenter backplane has failed.C A firmware update is required on the AMM.D A second AMM is required to view video on blades 9-14.
Monday, January 22, 2024
问题:单选题Selling the total solution includes adding services and financing options which ensures your customer will remain satisfied with their purchase. Which of the following best describes the benefits of Selling options, storage, services, and financing to your clients?()A More face time with the executivesB Enhanced credibility, higher profits, less competitive pressureC One source for elements, cleaner design, simpler supportD Locks competitors out of account
问题:单选题A prospective client needs to combine Ethernet, FCOE, and iSCSI.They have not been able to practically combine these in the past.Which IBM products meets this need of the following?()A BladeCenter Open Fabric Manager (BOFM)B SAN Volume Controller (SVC)C Virtual Fabric forBladeCenterD Network Provisioning on Demand in the AMM
Friday, April 19, 2024
问题:单选题Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()A PowerExecutiveB Active Energy Manager (AEM)C Tivoli Provisioning Manager (TPM)D Energy Monitoring and Control (EMC)
问题:单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports of an HS22 blade server can support if the blade does not have any expansion blades attached?()A 8B 6C 4D 2
问题:单选题Which is the packaging strategy of iDataPlex of the following?()A Fourteen servers per rack likeBladeCenterB Two servers per rack for optimal cooling costC One server per rack for optimal cooling and energy efficiencyD Four servers per rack (twoexach half high) for optimal cooling
Saturday, March 16, 2024
问题:单选题A customer asks the sales professional how to update the UEFI on the HX5. They do not want to use AMM. Which is the procedure of the following?()A InstallServerGuide CD/DVD,boot the HX5 blade and follow the promptsB Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the promptsC Press F1 while the HX5 is booting,incert the CD/DVD and select OKD Mount the IMM virtual disk
问题:单选题A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()A Consider two servers for redundancy and failoverB Web content static or dynamic informationC Processor utilization of the existing web serversD SCSI orFibre Channel storage solution
问题:单选题An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()A Add Rear Door HeateXchangerB Add fans to the top of the racksC Increase circulation from Data Center raised floorD Change to perforated doors
问题:单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A Support for10Gb internal networkB Support for SSDC Support for integrated disk drivesD Support for8Gb FC Switch Modules
问题:单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A What are Disaster RecoveryplansB What are plans for datamigrationC What storage system space isavailableD DoesiSCSI meet the needs
问题:单选题A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()A Usable densityB Lowest cost of acquisitionC Flexible configurations ready for integration and testing at the customer locationD Standard rack mounting
问题:单选题In which phase should a TDA be performed of the following?()A Server deploymentB Installation and server configurationC Problem determination / resolutionD Needs analysis and design