问题:单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A Support for10Gb internal networkB Support for SSDC Support for integrated disk drivesD Support for8Gb FC Switch Modules
Wednesday, February 14, 2024
问题:单选题A business partner wants to identify risks, develop action plans to manage the risks, and confirm resources required for a successful implementation of a BladeCenter solution to their customer. Which addresses this situation of the following?()A Conduct a TDAB Use IBM System xConfiguratioin and Option Guide (COG)C UsexREFD Conduct aServerProven Opportunity Request for Evaluation (SPORE)
Monday, January 22, 2024
问题:单选题An eX5 client is concerned about the cost-per-GB of the proposed SAS disk-based solution, and suggests using SATA disk technology in order to reduce costs for their 24x7 mission-critical Microsoft SQL Server application. Which addresses the customer issues of the following?()A SAS drives support automatic rebuild upon failure, SATA must be rebuilt manuallyB SAS drives supportFibre Channel attachment to eX5 servers, SATA does notC SATA drives require different, more expensive cables, and require more floor space compared with SASD SATA storage is slower, has lower mean time between failure, and designed for a lower duty cycle compared with SAS
Saturday, March 16, 2024
问题:单选题A customer plans to deploy Open Fabric Manager (OFM). Which vendors meet this need of the following?()A BrocadeB Blade Network Technology (BNT)C CiscoD Juniper
Friday, June 7, 2024
问题:单选题A System x client is interested in IBM ToolsCenter Bootable Media Creator but is concerned about functions Which describes the functions of ToolsCenter Bootable Media of the following?()A Updatefirmware, update drivers, run diagnostics, install WindowsB Update firmware, run diagnostics, install WindowsC Update firmware, run diagnostics, install Windows, and install LinuxD Update firmware, update drivers, install Windows, and install Linux
Saturday, April 6, 2024
问题:单选题A System x administrator is considering new storage subsystems. Which is a benefit of SAS over Solid State of the following?()A Higher transfer speedsB Increased power consumption with Solid StateC Increased bandwidthD Cost per MB
问题:单选题Which is the packaging strategy of iDataPlex of the following?()A Fourteen servers per rack likeBladeCenterB Two servers per rack for optimal cooling costC One server per rack for optimal cooling and energy efficiencyD Four servers per rack (twoexach half high) for optimal cooling
问题:单选题A healthcare and life sciences client wants to maintain electronic patient records, including medical images, for two years after each patient’s death. How would the IT storage industry describe this business goal?()A Archive solution that requires event-based retentionB Backup solution that provides version-based expirationC Business continuity solution that provides two years Recovery Time Objective (RTO)D Business continuity solution that provides two years Recovery Point Objective (RPO)
问题:单选题A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()A A power module has failed and there is not enough power to see video on all blades.B MUX 3 on theBladeCenter backplane has failed.C A firmware update is required on the AMM.D A second AMM is required to view video on blades 9-14.
问题:单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A 6B 8C 10D 12
问题:单选题The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion. The customer is concerned about cost. Which of the following meets the customers needs?()A DS3500 with SAS Host ConnectionB DS3500 withiSCSI Host ConnectionC DS3500 with FC ConnectionD DS5020
问题:单选题A retail customer has a database application that is accessed by a large number of people through a web interface from multiple remote locations. Which questions will provide the information necessary to design the best performing storage solution of the following?()A How many web servers will be connected to the database?B How many concurrent applications will run against the database?C How many concurrent users will be accessing the database?D What are the types of transactions run against the database?
问题:单选题A customer has reached the cooling limit in his datacenter, but still has room for additional IBM racks and servers. Which allow additinal future sales of the following?()A Rear Door HeateXchangerB ActiveEnery Manager(AEM)C Perforated doorsD IBM Cool Blue
Friday, April 19, 2024
问题:单选题In which phase should a TDA be performed of the following?()A Server deploymentB Installation and server configurationC Problem determination / resolutionD Needs analysis and design
问题:单选题A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()A Usable densityB Lowest cost of acquisitionC Flexible configurations ready for integration and testing at the customer locationD Standard rack mounting
问题:单选题An installed customer has developed human resource constraints in the IT department. Which of the following allows the sales professional to proceed with future sales?()A Proof of conceptB Volume sales discountsC ServicePacsD Industry leading technology
Wednesday, November 8, 2023
问题:单选题A customer wants to update their system with the latest drivers. Which tools would you suggest of the following?()A Bootable Media CreatorB Advanced Settings UtilityC Update Express System Pack InstallerD ServerGuide Scripting Toolkit